Conveyor Modules
Conveyor sections built complete with rollers, frames and drives, aligned and run.
Conveyor modules assembled and run before shipping, so the tracking and the drive are proven on our floor rather than on yours. Frames are squared on a fixture, not by eye.
Run-tested per module -±1 mm / mTo 50 kg/mTo design -
Lead Time
6–10 weeks
Min Order
1 piece
Certifications
ISO 9001:2015
Technical Specifications
| Parameter | Value | Unit |
|---|---|---|
| Tracking | Run-tested per module | - |
| Frame squareness | ±1 | mm / m |
| Load | To 50 | kg/m |
| Roller spacing | To design | - |
| Drive | Geared motor (sourced) | - |
| Documentation | Drawing + run record | supplied |
Available Materials
- Steel S355 (frames)
- Aluminium 6082-T6
- Steel 4140 (shafts)
- Bearing steel
- PVC / PU belting
Typical Applications
- Packaging lines
- Assembly conveyors
- Incline and decline transfer
- Inspection stations
- Waste handling
Surface Finishes
- Painted frames
- Powder coat
- Galvanised
- Stainless option (food plants)
- Crated for export
Industries Served
- Packaging
- Food Processing
- Warehousing
- Industrial Equipment
- Recycling & Waste
What drives the price of this part
Derived from the callouts on this page. Where a driver is not on the drawing, it is not on this list.
- Material
- The first material listed, Aluminium 6082-T6, rates 9/10 on our machinability scale at 95 HB. On this shop's scale a harder alloy means slower passes and more tool changes, and that is cycle time the quote has to carry.
- Order size
- Minimum order is 1 piece, so on a first order setup and programming are spread over very few parts and they are most of the price. Repeat orders at the same quantity are cheaper without anything on the drawing changing.
- Certification and paperwork
- ISO 9001:2015. On a certified family the inspection and documentation work is part of the price: first article inspection, material traceability and the dimensional report are produced per order, not per sample.
See how cycle time is calculated in the machining time calculator and what else moves a price in the cost driver reference.
How these parts are inspected
Matched to the callouts above and the instruments actually on the floor.
- Coordinate measuring machine (Zeiss CONTURA G2, two machines, GR&R 8.4% on the critical feature)
- Dimensional report against the drawing, with a 100% check on critical features rather than a sample
- Certificate of conformance and the mill certificate with every shipment
The full equipment list, with counts, is on the capability page; the inspection sequence is on quality and inspection.
Questions buyers ask
- Why run a conveyor before shipping?
- Because tracking problems appear in the first ten minutes of running. Finding that on our floor costs an hour; finding it on site costs a service visit.
Related part families
More in Assemblies & Kits
Assembled Sub-AssembliesHydraulic ManifoldsElectromechanical AssembliesPump AssembliesValve AssembliesGearbox AssembliesFrame & Machine KitsActuator AssembliesSpindle AssembliesCoupling AssembliesLinkage AssembliesMachine ModulesBrake AssembliesClutch AssembliesFilter Housings & AssembliesSensor Mounting AssembliesDrive AssembliesHydraulic & Pneumatic CylindersHeat Exchanger AssembliesEnclosure AssembliesPump CartridgesMotor AssembliesGear Motor UnitsTest Rig Assemblies

