Timing Gears - Gears & Drivetrain

Timing Gears

Timing and index gears with keyway or dowel location, marked for one-way assembly.

Timing gears where the angular position is the function, not just the ratio. They carry a keyway, a dowel hole or a mark, and we check the phase with a CMM against the datum.

±0.05 °AGMA 9–11 classKeyway / dowel / mark -1–6 module
Lead Time

4–6 weeks

Min Order

10 pieces

Certifications

ISO 9001:2015 · IATF 16949

Technical Specifications

ParameterValueUnit
Phase tolerance±0.05°
Tooth qualityAGMA 9–11class
LocationKeyway / dowel / mark-
Module range1–6module
Bore toleranceH7-
CMM phase checkPer lot-

Typical Applications

  • Engine timing trains
  • Indexing drives
  • Cam drives
  • Registration in printing
  • Packaging synchronisation

Surface Finishes

  • Case hardened
  • Ground flanks
  • Black oxide
  • Anodise (aluminium)
  • Phosphate

Industries Served

  • Automotive & EV
  • Packaging
  • Industrial Equipment
  • Motorsport
  • Agricultural Machinery

What drives the price of this part

Derived from the callouts on this page. Where a driver is not on the drawing, it is not on this list.

Tolerance
Phase tolerance at ±0.05 ° is the tightest callout this family carries. Tightening a callout is a process decision, not a machining decision: below the standard ±0.005 mm the work moves to grinding or jig boring, and the price moves with it.
Part size
Module range at 1–6 module decides which machine the part lands on and how many setups it needs. Size is the driver buyers most often leave out of a first enquiry, and it is the one that changes the quote fastest.
Material
The first material listed, Carbon Steel 4140 (42CrMo4), rates 6/10 on our machinability scale at 197–235 HB annealed · 28–32 HRC quenched and tempered. On this shop's scale a harder alloy means slower passes and more tool changes, and that is cycle time the quote has to carry.
Order size
Minimum order is 10 pieces, so on a first order setup and programming are spread over very few parts and they are most of the price. Repeat orders at the same quantity are cheaper without anything on the drawing changing.

See how cycle time is calculated in the machining time calculator and what else moves a price in the cost driver reference.

How these parts are inspected

Matched to the callouts above and the instruments actually on the floor.

  • Coordinate measuring machine (Zeiss CONTURA G2, two machines, GR&R 8.4% on the critical feature)
  • Dimensional report against the drawing, with a 100% check on critical features rather than a sample
  • Certificate of conformance and the mill certificate with every shipment
  • Bore gauges and an optical comparator for hole position and edge form
  • First article inspection to AS9102, because this family carries an aerospace or automotive certificate

The full equipment list, with counts, is on the capability page; the inspection sequence is on quality and inspection.

Questions buyers ask

How do you set the angular position?
From the datum on the bore or the locating dowel, checked on the CMM. Do it by eye against a mark and the machine will run out of phase by the time it reaches the last station.

Related part families

More in Gears & Drivetrain