Quality & Inspection

ISO 9001:2015 · AS9100D · IATF 16949 · NADCAP. Two Zeiss CMMs on the shop floor. First-pass yield above 96%, measured and reported per order.

Metrology lab — Zeiss CMM inspection of machined parts
Zeiss Contura · 20±1°C · GR&R certifiedCMM report shipped with every lot
CMM REPORT · NOMINAL / MEASURED / DEV · PASS

CMM REPORT · NOMINAL / MEASURED / DEV · PASS

Every critical feature measured. Report ships with the lot.

CALIBRATED INSTRUMENTS · 0.001 MM

CALIBRATED INSTRUMENTS · 0.001 MM

Micrometers, bore gages, height gages — NIST-traceable, on schedule.

How a Part Gets Inspected

01

Design Review & DFM

Engineer reviews your CAD for manufacturability, tolerance stack-ups, and cost-saving opportunities before quoting. FMEA completed for critical features.

02

First Article Inspection (FAI)

First part off the machine goes to the CMM lab. Full dimensional report per AS9102. Customer sign-off required before production release.

03

In-Process Inspection

SPC monitoring at every critical operation. CMM checks at defined intervals. Material certification verification. Surface finish measurement.

04

Final Inspection & Shipment

100% dimensional check on critical features. CoC, material certs, CMM reports packed with shipment. ISO 9001:2015 documentation control.

Certifications & Scope

ISO 9001:2015

Bureau Veritas

Design, manufacture and inspection of precision machined components

BV-2015-18452

Download Certificate →

AS9100D

PRI Registrar

Aerospace quality management for safety-critical component production

PRI-AS9100-2024-7831

Download Certificate →

IATF 16949

TUV SUD

Automotive quality management for serial production parts

TS-16949-2024-4521

Download Certificate →

NADCAP (NDT)

PRI

Non-destructive testing: penetrant, magnetic particle, ultrasonic

NADCAP-2024-3317

Download Certificate →

NADCAP (HT)

PRI

Heat treatment: annealing, solution treat, age harden

NADCAP-HT-2024-2145

Download Certificate →

Certifications verified by Bureau Veritas, PRI Registrar, and TUV SUD. Copies available upon request in full resolution.

Material Traceability

  • Full material certification per EN 10204 Type 3.1
  • Heat/lot number tracking through every process step
  • Certifications verified against material standards (ASTM, AMS, QQ, MIL)
  • Certificate of Conformance with each shipment
  • RoHS / REACH compliance declarations available
  • Conflict minerals statement upon request

FAI / PPAP Capability

  • AS9102 First Article Inspection (aerospace/defence)
  • PPAP Level 3 documentation (automotive)
  • Gauge R&R studies per MSA 4th edition
  • Process FMEA per AIAG/VDA handbook
  • Control plan generation with customer-specific requirements
  • APQP documentation support for new product launches

What a CMM Report Looks Like

This is the dimensional report that ships with a typical order. Feature names, nominals and measured values — no interpretation needed, your QA files it as-is. (Sample data, customer name removed.)

FeatureNominalMeasuredDeviationToleranceStatus
Ø12 H7 bore12.00012.003+0.003+0.018 / 0PASS
Bore true position (A|B)Ø0.02Ø0.011Ø0.02 maxPASS
Face flatness0.010.0060.01 maxPASS
Overall length420.000419.997-0.003±0.05PASS
Surface finish Ra0.80.620.8 maxPASS

Machine: Zeiss CONTURA G2 · Temperature 20±1°C · Report ID: CMM-2026-0715-034

PPAP Level 3 — What We Deliver

Design FMEA (DFMEA)
Process FMEA (PFMEA)
Process flow diagram
Control plan (per AIAG)
MSA / Gage R&R studies
Cp/Cpk capability data
Material certification (EN 10204 3.1)
Dimensional layout report
Appearance approval report (AAR)

Customer-specific requirements (CSR) reviewed before quoting — if your OEM expects additional items, we add them to the plan up front.

Verified Claims — What We State, and What Proves It

Every claim on this site is classified by how it is evidenced — certified, accredited, capable, or internal practice. Nothing is presented as certified unless a certificate exists. Unverified claims are flagged for human review.

ClaimTypeEvidenceSourceVerified
ISO 9001:2015 certified for design, manufacture and inspection of precision machined componentsCERTIFIEDCertificate copy available on request; audited on siteBureau Veritas2026-06-18
AS9100D aerospace quality managementCERTIFIEDCertificate copy available on request; FAI per AS9102 on aerospace ordersPRI (Performance Review Institute)2026-06-18
IATF 16949 automotive quality for serial productionCERTIFIEDCertificate copy available on request; PPAP Level 3 supportedTÜV SÜD2026-06-18
NADCAP accredited for NDT and heat treat special processesACCREDITEDAccreditation scope on request; penetrant, magnetic particle, ultrasonicPRI / NADCAP2026-06-18
98.7% on-time deliveryINTERNAL_PRACTICEERP order fulfilment records, last 12 monthsInternal ERP (order tracking)2026-06-01
12,500+ projects delivered since 2005INTERNAL_PRACTICEProject ledger count since foundingInternal ERP / project records2026-06-01
In-house CMM metrology — two Zeiss machines, GR&R 8.4%INTERNAL_PRACTICEGR&R study on critical feature, 2026-06-18Internal metrology lab records2026-06-18
±0.005mm standard machining toleranceCAPABLEProcess capability studies on standard features; tighter on requestInternal process data / CMM records2026-06-01
5-axis machining on DMG MORI / Mazak centresCAPABLEMachine fleet list; 40+ CNC machines on the shop floorInternal equipment register2026-06-01
ITAR-compliant handling of export-controlled dataINTERNAL_PRACTICEData-handling procedure for controlled drawings; written procedure on requestInternal compliance procedure2026-06-01
Weekly FedEx / DHL shipping to US, EU and Middle EastINTERNAL_PRACTICECarrier booking records, 15 countries servedInternal logistics records2026-06-01

Last verified 2026-06-18 · certificate copies and audit kit available below · 1 item flagged for human review

SPC & Cp/Cpk — Process Evidence

For serial production we do not only check the part — we watch the process. Statistical process control tells you whether a run is drifting before it leaves tolerance, and capability indices tell you how much headroom the process actually has.

SPC

X-bar & R charts

Critical dimensions charted per batch; out-of-control points investigated before shipment, not after.

Cp / Cpk

≥ 1.33 typical

Capability reported on request for serial features. If a process cannot hold 1.33 with margin, we tell you before quoting.

GR&R

8.4% on critical feature

Gauge repeatability & reproducibility study on the CMM, 2026-06-18. Measurement system is not the bottleneck.

Digital Trust Center — Audit Kit

We cannot bring your quality team to Xi\u2019an every quarter, so we bring the audit to you. Request the full kit below — no sales call required, nothing gated behind a meeting:

Quality manual and procedure index (current revision)
Calibration records summary — CMM, gauges, hardness testers (ISO 10012)Download
Sample AS9102 FAI report (customer names redacted)Download
Sample CMM dimensional report (customer names redacted)Download
NADCAP scope of accreditation (NDT & heat treat)
Certificate copies — ISO 9001:2015, AS9100D, IATF 16949
Supplier self-assessment questionnaire (SAQ)
Live video walkthrough of the factory floor — 30 min, engineer-led
Request the Audit Kit →Delivered within 2 business days · NDA not required for redacted samples

ITAR & Export Control

ITAR-compliant data handling for defence work. Defence data on physically isolated servers, access restricted to trained staff, transfers logged.

Calibration System

All inspection equipment calibrated per ISO 10012. Zeiss CMM serviced annually. Gauges certified to NIST-traceable standards. Recall system prevents use of uncalibrated tools.

Supplier Audit Welcome

On-site quality audits welcomed. Remote audits supported via video walkthrough. Quality manual and procedures available for review upon request.

Documentation Included with Every Order

Certificate of Conformance (CoC)

PDF

Material Certification (EN 10204 3.1)

PDF

Dimensional Inspection Report (CMM)

PDF

Surface Finish Measurement Report

PDF

See also: Tolerance Guide · Surface Finishes Guide · IP Protection Policy

Engineering feedback within 24 hoursProduction starts only after sample approvalNDA available + IP protected

Put the inspection data to work on your part.

Send the drawing. You get CMM-backed quality and a report with every shipment — not a promise.

Talk to an Engineer