CNC Machining for Turkey

Precision machined parts from our Xi’an factory to Turkey in 5-7 business days. Defence (ASELSAN supply chain) and industrial equipment buyers across the market.

Why Turkey Buyers Work With Us

Eurasia bridge logistics

Parts clear through Istanbul efficiently — DHL Express 5-7 days to major Turkish industrial cities.

,

Defence-grade data handling

Export-controlled drawing procedures for Turkish defence primes, with NDA in place.

,

EUR / TRY invoicing

Local-currency invoicing removes FX friction from the procurement process.

,

IATF 16949 serial parts

Automotive clusters in Bursa and Kocaeli get PPAP Level 3 and SPC data.

,

Why Turkish manufacturers buy machined parts from Xi’an

Turkish manufacturing — machine builders in Bursa and Konya, white-goods suppliers, defence subcontractors around Ankara — works on tight margins and tight deadlines. A machined part quoted at USD 60–100 locally lands at USD 22–45 from us, freight included. For export-oriented producers selling into the EU, the documentation and tolerance capability matter as much as price.

We see two recurring reasons Turkish buyers come to us: 5-axis geometry their local shops cannot quote, and certification packages (ISO 9001, IATF 16949, AS9100D) that their own EU customers require.

Tolerances and drawing standards

Turkish packages follow TS EN ISO 2768 and ISO 1101. Standard ±0.05 mm; ±0.01 mm critical; ±0.005 mm ground. CMM reports in English or Turkish on request.

Every production order ships with inspection report, material certificate and CoC.

Materials ordered from Turkey

Turkish orders skew toward: 6061-T6 and 7075-T6, 304/316 stainless, 17-4PH and 15-5PH for defence, Inconel 718, and 4140 for hydraulic components. Send the grade and we confirm stock before quoting.

Finishes: as-machined Ra 1.6, Ra 0.8 for sealing faces, anodize (including MIL-A-8625 on request), passivation. Flagged if not guaranteed.

Lead times, customs and time zones

Xi’an is five hours ahead of Istanbul. Prototypes 10–15 working days, production 3–5 weeks, then 3–4 days via DHL/FedEx to Istanbul, customs handled. Sea freight available for large volumes via Mersin or Ambarlı.

Payment T/T, PayPal or L/C; invoices in TRY, USD or EUR; proforma for first orders. Project managers answer around the clock.

Industries We Supply in Turkey

Defence (ASELSAN supply chain)

AS9100D controlled work with ITAR-compliant data handling.

,

Automotive (Bursa, Kocaeli)

Gearbox and engine components, IATF 16949 serial production.

,

White Goods (Manisa)

High-volume appliance parts, competitively priced.

,

Machinery & Equipment

Housings, shafts and couplings in steel and cast iron.

,

Textile Machinery

Precision components for weaving and spinning equipment.

,

Renewable Energy

Wind and solar components in aluminium and stainless.

,

Send Us Your Drawing

Upload the STEP file. An engineer reviews it within 24 hours and comes back with a price, lead time and DFM notes.

Request a Quote →

Related Resources

Engineering feedback within 24 hoursProduction starts only after sample approvalNDA available + IP protected
Talk to an Engineer